|
|
|
![]() Wormy Pine Hutch 72"wide x 85"tall made from trees cut in my back yard. |
|
![]() Galley kitchen. All cabinets were removed. Sink/dishwasher/fridge moved to outer wall under window. R&R vinyl floor/subfloor. |
![]() All new (Ikea) cabinets/range hood. Plumbing/Electrical/Gas/Tile via outside contractors. |
|
|
![]() All new 6x6 corner posts, 4x6 line posts, Deck Band bolted to house structure, copper flashing installed at house. All rot repaired & siding replaced. |
![]() Leaky patio door caused major rot in sill/subfloor. All rot replaced, outer siding removed, installed new door framing, waiting for inspection. |
![]() Outer siding, door & trim installed, wall ready to paint. |
![]()
More coming soon.