-
Jan 22, 2002: Traded a 93 Mustang for
a 68 Camaro....
-
Jan 29,2002: Pictures before teardown
-
Feb 8, 2002: The teardown complete...
-
Mar 2, 2002: Rear 3" Mini Tubs
complete...
-
Mar 17, 2002: Rollcage install (In
progress)
-
Apr 4,
2002: Tire fitment in new minitub...
-
Aug. 28, 2002: New Fikse
Wheels & Tire fitment
rearend)
-
Dec.22,2002: Dropped to the ground
-
Jan
5, 2003: Pre Scaling of car (50/50 @ 2700#)
-
Jan 12, 2003: Dash Replacement (Mild Rust)
-
Feb 8. 2003: Completed pre-fit rear suspension torque arm assembly.
- Apr 14. 2003: McLeod Twin Disk Clutch Aluminum Flywheel Changeover.
-
May 3. 2003: Body Stripping and Firewall Work
-
May
21, 2003: Dash Smoothing, DSE Subframe Connector install.
-
June
11, 2003: Tunnel raising, Throttle mounting, Seat Mounting (lowering)
-
July
11, 2003: Reassembly of front end to ensure proper fitment.
-
Sept 4, 2003: Received custom built Ron Davis Intercooler and Radiator.
|