January 2006
Jan. 11 here is some of the sub roadbed cut and in place and some markings done in Photoshop to show how things will look.


January 14 , being able to run trains on some of the lower track again.

This is the mountain end of the layout and most of the plywood, sub roadbed is in place and concrete arch bridge are in place along with the Lionel arch bridge planned for over a small ravine .